Acceptance of Chengdu Taixing 220kV Intelligent Substation

In mid-November 2011, at the Taixing 220kV intelligent substation in Chengdu, Sichuan, our company's engineering and technical personnel used the XL-808 in cooperation with the Sichuan Electric Power Research Institute to inspect and accept the Weisheng digital energy meters at multiple line intervals of the station. On-site comparison with digital energy meter calibrators from several other manufacturers showed that our equipment was much more convenient and faster during testing, significantly shortening the test time and saving considerable manpower and material resources, earning recognition and praise from the relevant responsible persons of the institute.