Chengdu Excellence Shuneng Testing Co., Ltd. AC/DC Charging Pile Testing

In July 2021, our company's technicians, together with technicians from Chengdu Zhuoyue Shuneng Testing Co., Ltd., visited the Chengdu Pengruili Qingyang Plaza Charging Station. They used the XL-942 non-vehicle-mounted charger on-site characteristic tester, XL-943 AC charging pile on-site characteristic tester, and supporting loads to test AC and DC charging piles. The testing items covered the "GB/T 34657.1-2017 Electric Vehicle Conductive Charging Interoperability Test Specification", "GB-T 34658-2017 Consistency Test of Communication Protocol between Electric Vehicle Non-vehicle-mounted Conductive Charger and Battery Management System", "NBT33008.1-2018 Electric Vehicle Charging Equipment Inspection and Test Specification Part 1: Non-vehicle-mounted Charger", and "JJG1149-2018 National Metrology Verification Regulation", successfully completing the testing of AC and DC charging piles at this site.


Pengruili Qingyang Plaza Charging Station