Home
Product Center
Charging Pile Testing Equipment
Standard Power Source/Meter
Mutual Inductor (Sensor) Calibration Equipment
Digital Substation Calibration Equipment
Solution
Multidimensional solutions for charging stations
Solution for Mandatory 3C Testing of Charging Piles
Comprehensive process solutions for charging pile enterprises
Charging pile testing solutions for European, American, and Japanese standards
Current Transformer (Sensor) Detection Solution
DC Power Traceability Testing Solution
News
Corporate News
Industry News
Service and Support
Resource Center
Service Center
Typical Cases
About Xinglong
Company Profile
Contact Us
Charging Pile Inspection Case
Intelligent Substation Test Case
DC Meter/Shunt Calibration Case
Distribution Network Primary and Secondary Integration Verification Case
Trip to Yingcheng, Hubei - Our company's XL-807 electronic transformer tester successfully assisted in the acceptance of the photoelectric transformer at Yingcheng 220kV substation
Zhangbei Daqinggou 110kV Substation
On-site testing at the 110kV substation in Changshan, Beilun, Ningbo City, Zhejiang Province
Guizhou Zunyi 110KV Digital Station Test
Testing at Dongxing 220kV Substation, Tianjin
Technical Exchange at Baiwu Substation
Acceptance of Kaili Baiwu Substation
Trial testing of electronic transformers at Xining East City 110kV intelligent substation
Liuwan 110kV Intelligent Substation Technical Exchange
Acceptance of Chengdu Taixing 220kV Intelligent Substation
Debugging of Chuzhou Entrepreneurship 110kV Intelligent Substation
Jilin Changchun Jincheng 500kV Substation Testing
Pinggao Group Assistance Testing
Inner Mongolia Ulanqab Dorbod 220kV Digital Substation Testing
Yongning 110kV Intelligent Substation Testing
Jiangtao 220kV Substation of Zhejiang Electric Power Company
Testing at Longhui 220kV Substation, Shaoyang, Hunan
Wenzhou Baihua 110kV Intelligent Substation Measurement Station